REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sealing Rings
from 100 pcsStandard: 3–5 daysDelivery to Yakkasaray in 1 dayQuality guarantee

Custom Sealing Rings in Yakkasaray District, Tashkent

We manufacture sealing rings by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery to Yakkasaray in 1 day. We work with food plants and warehouse complexes. Yakkasaray District is active in food and warehousing; for Sealing Rings we match materials to Yakkasaray food plants and warehouses operating conditions.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKM (chemical-resistant)Silicone (food-grade / heat-resistant)Polyurethane
Applications
  • Hydraulic systems
  • Pneumatic equipment
  • Pumps and compressors
  • Pipeline fittings
  • Automotive industry
Advantages
  • ✓Exact dimensional compliance
  • ✓Production from 100 pcs
  • ✓Material selection for working environment
  • ✓Standard lead time 3–5 business days
  • ✓Rework guarantee at our expense

Yakkasaray food plants use food-grade silicone and EPDM rings for pumps, valves and pipelines of dairy, canning and meat processing lines.

Yakkasaray District is Tashkent's business center with banks, shopping centers and service enterprises. Auto services and repair shops order oil-resistant NBR seals for engines and hydraulic systems, plus gaskets for building plumbing systems.

Delivery & production

Yakkasaray District · Delivery to Yakkasaray in 1 day

Manufactured in Tashkent. Delivery to Yakkasaray in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cup to 25 barNBR, HNBR
Steam, hot waterup to +150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yakkasaray District by courier or carrier. Delivery to Yakkasaray in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yakkasaray District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yakkasaray District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yakkasaray in 1 day. After production we hand over to a carrier or arrange courier delivery.