REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sealing Rings
from 100 pcsStandard: 3–5 daysDelivery in Tashkent in 1 dayQuality guarantee

Custom Sealing Rings in Tashkent

We manufacture sealing rings by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery in Tashkent in 1 day. We work with industrial enterprises in Tashkent. Tashkent is strong in machine-building, food and construction — for Sealing Rings we match rubber grades to actual operating conditions at regional sites.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKM (chemical-resistant)Silicone (food-grade / heat-resistant)Polyurethane
Applications
  • Hydraulic systems
  • Pneumatic equipment
  • Pumps and compressors
  • Pipeline fittings
  • Automotive industry
Advantages
  • Exact dimensional compliance
  • Production from 100 pcs
  • Material selection for working environment
  • Standard lead time 3–5 business days
  • Rework guarantee at our expense

Tashkent machine-building plants and food factories are the main customers for sealing rings. We use NBR for hydraulic systems, food-grade silicone for dairy and canning equipment.

Tashkent is Uzbekistan's capital and largest industrial hub. Machine-building plants, textile mills, food factories and construction companies here constantly need quality seals, gaskets and technical rubber parts. Our factory is located directly in Tashkent, enabling on-site measurement, sample pickup and same-day delivery.

Delivery & production

Tashkent · Delivery in Tashkent in 1 day

Manufactured in Tashkent. Delivery in Tashkent in 1 day. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cup to 25 barNBR, HNBR
Steam, hot waterup to +150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Tashkent by transport company. Delivery in Tashkent in 1 day. Double packaging and cargo tracking. Pickup from our Tashkent plant by appointment.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Tashkent. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Tashkent, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery in Tashkent in 1 day. After production we hand over to a carrier or arrange courier delivery. Pickup from our Tashkent plant by appointment.