REZINA.UZ
ELASTIK FORM
From idea to finished part.
Sealing Rings
from 100 pcsStandard: 3–5 daysDelivery to Termez in 2-3 daysQuality guarantee

Custom Sealing Rings in Termez

We manufacture sealing rings by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery to Termez in 2-3 days. We work with Surkhandarya region industrial facilities. Termez is strong in border logistics and industry — for Sealing Rings we match rubber grades to actual operating conditions at regional sites.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKM (chemical-resistant)Silicone (food-grade / heat-resistant)Polyurethane
Applications
  • Hydraulic systems
  • Pneumatic equipment
  • Pumps and compressors
  • Pipeline fittings
  • Automotive industry
Advantages
  • ✓Exact dimensional compliance
  • ✓Production from 100 pcs
  • ✓Material selection for working environment
  • ✓Standard lead time 3–5 business days
  • ✓Rework guarantee at our expense

Termez industrial facilities and logistics bases order NBR and EPDM rings for pumps, compressors and conveyors at border warehouses and terminals.

Surkhandarya is Uzbekistan's hottest area (up to +50°C in summer). Surkhandaryocement factories operate in abrasive dust and high heat, while cotton plants need seals for oil presses. We select heat-resistant EPDM and Viton grades designed for the extreme southern climate.

Delivery & production

Termez · Delivery to Termez in 2-3 days

Manufactured in Tashkent. Delivery to Termez in 2-3 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cup to 25 barNBR, HNBR
Steam, hot waterup to +150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Termez by transport company. Delivery to Termez in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Termez. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Termez, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Termez in 2-3 days. After production we hand over to a carrier or arrange courier delivery.