REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Sealing Rings
from 100 pcsFrom 48 hoursDelivery to Termez in 2-3 daysQuality guarantee

Sealing Rings in Termez — Production & Delivery

Direct-from-manufacturer sealing rings supply to Termez. Any volume from 100 pcs, materials: NBR, EPDM, Viton / FKM. Full cycle: measurement → mold → series. Delivery to Termez in 2-3 days. Termez is strong in border logistics and industry — for Sealing Rings we match rubber grades to actual operating conditions at regional sites.

Materials
NBR (oil-resistant)EPDM (heat-resistant)Viton / FKM (chemical-resistant)Silicone (food-grade / heat-resistant)Polyurethane
Applications
  • Hydraulic systems
  • Pneumatic equipment
  • Pumps and compressors
  • Pipeline fittings
  • Automotive industry
Advantages
  • Exact dimensional compliance
  • Production from 100 pcs
  • Material selection for working environment
  • Production start from 48 hours
  • Rework guarantee at our expense

Production in Tashkent. Delivery to Termez in 2-3 days. Shipped by transport company, packaging included.

Termez industrial facilities and logistics bases order NBR and EPDM rings for pumps, compressors and conveyors at border warehouses and terminals.

Surkhandarya is Uzbekistan's hottest area (up to +50°C in summer). Surkhandaryocement factories operate in abrasive dust and high heat, while cotton plants need seals for oil presses. We select heat-resistant EPDM and Viton grades designed for the extreme southern climate.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Oil, diesel, fuels−30…+120 °Cup to 25 barNBR, HNBR
Steam, hot waterup to +150 °Cup to 16 barEPDM
Acids, alkalis, solventsup to +200 °Cup to 40 barViton / FKM
Food media, CIP cleaning−40…+180 °Cup to 10 barFood-grade silicone

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Termez by transport company. Delivery to Termez in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Termez. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Termez, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts