REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Bushings
from 100 pcsFrom 48 hoursDelivery to Andijan in 1-2 daysQuality guarantee

Bushings factory for Andijan — Full cycle & delivery

Material engineering for bushings in Andijan: medium, temperature and pressure analysis → optimal grade from NBR, EPDM, Natural rubber. Delivery to Andijan in 1-2 days. Fergana Valley industrial enterprises. Andijan is strong in automotive and electrical — for Bushings we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

UzAuto Andijan plant suspension, levers and transmission units use rubber-metal bushings. We produce by OEM drawings, Shore A 50–70.

Andijan region is Uzbekistan's machine-building center. UzAuto Motors, Andijankabel electrical plant and oil processing create steady demand for automotive seals, cable bushings and food-grade gaskets. We've worked with valley enterprises for over 3 years and understand each industry's requirements.

Delivery & production

Andijan · Delivery to Andijan in 1-2 days

Manufactured in Tashkent. Delivery to Andijan in 1-2 days. Packed in corrugated cardboard and stretch film.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Andijan by transport company. Delivery to Andijan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Andijan. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Andijan, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Andijan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Andijan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts