REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Bushings
from 100 pcsFrom 48 hoursDelivery to Bukhara in 1-2 daysQuality guarantee

Buy Bushings in Bukhara — From 100 pcs, from 48h

Direct-from-manufacturer bushings supply to Bukhara. Any volume from 100 pcs, materials: NBR, EPDM, Natural rubber. Full cycle: measurement → mold → series. Delivery to Bukhara in 1-2 days. Bukhara is strong in oil & gas and cotton processing — for Bushings we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

Bukhara oil&gas drilling rigs and pump units use NBR rubber-metal vibration-isolating bushings with enhanced oil resistance for hydrocarbon contact.

Bukhara region is a major oil & gas center in Uzbekistan. The Bukhara refinery and dozens of gas extraction sites are located here. Cotton processing, leather and gold mining companies also create steady demand for oil-resistant seals, pump cuffs and molded parts.

Delivery & production

Bukhara · Delivery to Bukhara in 1-2 days

Manufactured in Tashkent. Delivery to Bukhara in 1-2 days. Packed in corrugated cardboard and stretch film.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Bukhara by transport company. Delivery to Bukhara in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Bukhara. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Bukhara, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via Telegram @Uzne0 — we quote lead time, material and price. For plants in Bukhara, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Bukhara in 1-2 days. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts