REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Bushings
from 100 pcsFrom 48 hoursDelivery to Fergana in 1-2 daysQuality guarantee

Bushings in Fergana — Production & Delivery

Manufacturing bushings for Fergana — from single samples to serial batches. We use NBR, EPDM, Natural rubber, selecting the grade for your operating conditions. Delivery to Fergana in 1-2 days. Fergana is strong in petrochemicals and chemicals — for Bushings we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

Manufactured in Tashkent. Delivery to Fergana in 1-2 days. Packed in corrugated cardboard and stretch film.

Fergana chemical reactor mixers require vibration isolation — NBR and Viton bushings with metal sleeve. Oil-resistant variants for refinery pumps.

Fergana region is Uzbekistan's chemical industry center. The Fergana refinery and Fergana-Azot have strict requirements for seal chemical resistance. We select materials (Viton, FKM, PTFE) for aggressive media at temperatures up to +250°C, ensuring long part service life.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal
Conveyors, drives−20…+60 °Cup to 10 barNR, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Fergana by transport company. Delivery to Fergana in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Fergana. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Fergana, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts