REZINA.UZ
ELASTIK FORM
From idea to finished part.
Bushings
from 100 pcsStandard: 3–5 daysDelivery to Kungrad in 2–3 daysQuality guarantee

Custom Rubber Bushings in Kungrad

We take orders for rubber bushings for plants in Kungrad. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Natural rubber. Delivery to Kungrad in 2–3 days.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • ✓Rubber-metal constructions
  • ✓Precision injection molding
  • ✓Vibration damping
  • ✓Any size by drawing
  • ✓Import substitute

For the Kungrad soda plant, EPDM is recommended for alkali and brine. FKM for joints hotter than the EPDM limit. Transit to Karakalpakstan is 2–3 days, so the shipment goes in reinforced packing.

Delivery & production

Kungrad · Delivery to Kungrad in 2–3 days

Manufactured in Tashkent. Delivery to Kungrad in 2–3 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Kungrad by transport company. Delivery to Kungrad in 2–3 days. Double packaging and cargo tracking. For Karakalpakstan we use reinforced packaging — transit takes longer than usual.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Kungrad. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Kungrad, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Kungrad in 2–3 days. After production we hand over to a carrier or arrange courier delivery. For Karakalpakstan we use reinforced packaging — transit takes longer than usual.