REZINA.UZ
ELASTIK FORM
From idea to finished part.
Bushings
from 100 pcsStandard: 3–5 daysDelivery to Navoi in 1-2 daysQuality guarantee

Custom Rubber Bushings in Navoi

We manufacture rubber bushings by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Natural rubber. Delivery to Navoi in 1-2 days. We work with Navoi region mining and industrial enterprises. Navoi is strong in mining and metallurgy — for Rubber Bushings we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • ✓Rubber-metal constructions
  • ✓Precision injection molding
  • ✓Vibration damping
  • ✓Any size by drawing
  • ✓Import substitute

Navoi MMC mining machines and conveyors work under heavy vibration and abrasion. High-hardness polyurethane and rubber-metal bushings Shore A 80–90.

Navoi region is Uzbekistan's mining heartland. Navoi MMC (Central Asia's largest gold and uranium producer) operates thousands of heavy equipment units requiring bushing, damper and seal replacement. We manufacture parts from high-strength polyurethane and Viton that withstand abrasive mining conditions.

Delivery & production

Navoi · Delivery to Navoi in 1-2 days

Manufactured in Tashkent. Delivery to Navoi in 1-2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Navoi by transport company. Delivery to Navoi in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Navoi. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Navoi, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Navoi in 1-2 days. After production we hand over to a carrier or arrange courier delivery.