REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Bushings
from 100 pcsFrom 48 hoursDelivery to Mirzo-Ulugbek in 1 dayQuality guarantee

Bushings factory for Mirzo-Ulugbek District

Urgent bushings to Mirzo-Ulugbek District: from 48 hours, Tashkent factory. NBR, EPDM, Natural rubber. Delivery to Mirzo-Ulugbek in 1 day. For machine-building factories and chemical plants. Mirzo-Ulugbek District is active in machine-building and chemicals; for Bushings we match materials to Mirzo-Ulugbek machine-building and chemical plants operating conditions.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

Made in Tashkent, delivery across Mirzo-Ulugbek District in 1 day. Corrugated cardboard and stretch wrap.

Mirzo-Ulugbek machine-building plants use rubber-metal bushings in press, gearbox and conveyor units. Chemical enterprises order chemical-resistant NBR and Viton variants.

Mirzo-Ulugbek District has historically specialized in machine-building and chemical industry. Major district factories regularly order sealing rings for reactors, hydraulic cylinder cuffs and chemical-resistant Viton and PTFE gaskets. We know the technical requirements of district industrial enterprises and select materials considering the working medium.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal
Conveyors, drives−20…+60 °Cup to 10 barNR, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Mirzo-Ulugbek District same day or next morning by courier or carrier. Delivery to Mirzo-Ulugbek in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Mirzo-Ulugbek District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Mirzo-Ulugbek District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts