REZINA.UZ
ELASTIK FORM
From idea to finished part.
Bushings
from 100 pcsStandard: 3–5 daysDelivery to Sergeli in 1 dayQuality guarantee

Custom Rubber Bushings in Sergeli District, Tashkent

We manufacture rubber bushings by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Natural rubber. Delivery to Sergeli in 1 day. We work with construction companies and utilities. Sergeli District is active in construction and utilities; for Rubber Bushings we match materials to Sergeli construction and utility services operating conditions.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

Sergeli construction and utility machinery need vibration-isolating bushings for crane, excavator and pump unit supports. NR and SBR by shaft size.

Sergeli District is booming: new residential complexes are built, utilities are laid, manufacturing opens. Water supply pump stations, construction companies and utilities create steady demand for EPDM seals for water systems, cuffs for construction equipment and plumbing gaskets.

Delivery & production

Sergeli District · Delivery to Sergeli in 1 day

Manufactured in Tashkent. Delivery to Sergeli in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Sergeli District by courier or carrier. Delivery to Sergeli in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Sergeli District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Sergeli District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Sergeli in 1 day. After production we hand over to a carrier or arrange courier delivery.