REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Bushings
from 100 pcsFrom 48 hoursDelivery to Shaykhantohur in 1 dayQuality guarantee

Bushings in Shaykhantohur District — Urgent from 48h

Rework guarantee for bushings. NBR, EPDM, Natural rubber, delivery to Shaykhantohur District. Delivery to Shaykhantohur in 1 day. Shaykhantohur District is active in industry and services; for Bushings we match materials to Shaykhantohur industrial and service enterprises operating conditions.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

Made in Tashkent, delivery across Shaykhantohur District in 1 day. Corrugated cardboard and stretch wrap.

Shaykhantohur enterprise boiler equipment and industrial fans are mounted on EPDM and NR rubber vibration-isolating bushings and supports.

Shaykhantohur is Tashkent's oldest administrative district. The dense water supply, sewage and heating networks require constant replacement of valve seals, pump cuffs and flange gaskets. District utility companies are our regular partners.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal
Conveyors, drives−20…+60 °Cup to 10 barNR, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Shaykhantohur District same day or next morning by courier or carrier. Delivery to Shaykhantohur in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Shaykhantohur District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Shaykhantohur District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts