REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Bushings
from 100 pcsFrom 48 hoursDelivery to Yakkasaray in 1 dayQuality guarantee

Bushings factory for Yakkasaray District

Material selection for bushings in Yakkasaray District: NBR, EPDM, Natural rubber. Delivery to Yakkasaray in 1 day. food plants and warehouse complexes. Yakkasaray District is active in food and warehousing; for Bushings we match materials to Yakkasaray food plants and warehouses operating conditions.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

Own factory in Tashkent — courier or carrier to Yakkasaray District. Reliable packaging, tracking.

Yakkasaray food equipment and warehouse conveyor vibration-isolating bushings — EPDM and NR. Freezer chambers — bushings retaining elasticity to −50°C.

Yakkasaray District is Tashkent's business center with banks, shopping centers and service enterprises. Auto services and repair shops order oil-resistant NBR seals for engines and hydraulic systems, plus gaskets for building plumbing systems.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal
Conveyors, drives−20…+60 °Cup to 10 barNR, CR

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Yakkasaray District same day or next morning by courier or carrier. Delivery to Yakkasaray in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yakkasaray District. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Yakkasaray District, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts