REZINA.UZ
ELASTIK FORM
From idea to finished part.
Bushings
from 100 pcsStandard: 3–5 daysDelivery to Yashnabad in 1 dayQuality guarantee

Custom Rubber Bushings in Yashnabad District, Tashkent

We manufacture rubber bushings by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Natural rubber. Delivery to Yashnabad in 1 day. We work with food enterprises and repair workshops. Yashnabad District is active in food and repair; for Rubber Bushings we match materials to Yashnabad food enterprises and repair shops operating conditions.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • ✓Rubber-metal constructions
  • ✓Precision injection molding
  • ✓Vibration damping
  • ✓Any size by drawing
  • ✓Import substitute

Yashnabad food shop equipment and warehouse conveyors use NR and EPDM vibration-isolating bushings. Refrigeration equipment — frost-resistant CR variants.

Yashnabad is one of Tashkent's oldest industrial districts. Large textile mills order vibration-isolating bushings, food plants order silicone seals, construction bases order hydraulic cuffs and gaskets for construction equipment. We supply in batches under contract.

Delivery & production

Yashnabad District · Delivery to Yashnabad in 1 day

Manufactured in Tashkent. Delivery to Yashnabad in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yashnabad District by courier or carrier. Delivery to Yashnabad in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yashnabad District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yashnabad District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yashnabad in 1 day. After production we hand over to a carrier or arrange courier delivery.