REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Bushings
from 100 pcsFrom 48 hoursDelivery to Yashnabad in 1 dayQuality guarantee

Bushings factory for Yashnabad District

Urgent bushings to Yashnabad District: from 48 hours, Tashkent factory. NBR, EPDM, Natural rubber. Delivery to Yashnabad in 1 day. For food enterprises and repair workshops. Yashnabad District is active in food and repair; for Bushings we match materials to Yashnabad food enterprises and repair shops operating conditions.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • Rubber-metal constructions
  • Precision injection molding
  • Vibration damping
  • Any size by drawing
  • Import substitute

Yashnabad food shop equipment and warehouse conveyors use NR and EPDM vibration-isolating bushings. Refrigeration equipment — frost-resistant CR variants.

Yashnabad is one of Tashkent's oldest industrial districts. Large textile mills order vibration-isolating bushings, food plants order silicone seals, construction bases order hydraulic cuffs and gaskets for construction equipment. We supply in batches under contract.

Delivery & production

Yashnabad District · Delivery to Yashnabad in 1 day

We deliver to Yashnabad District same day or next day. Proper packaging, documentation for every batch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

Our factory is in Tashkent — we deliver to Yashnabad District same day or next morning by courier or carrier. Delivery to Yashnabad in 1 day. Packaging and documents for every batch.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yashnabad District. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Yashnabad District, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yashnabad District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yashnabad in 1 day. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts