REZINA.UZ
ELASTIK FORM
From idea to finished part.
Bushings
from 100 pcsStandard: 3–5 daysDelivery in Tashkent in 1 dayQuality guarantee

Custom Rubber Bushings in Tashkent

We manufacture rubber bushings by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Natural rubber. Delivery in Tashkent in 1 day. We work with industrial enterprises in Tashkent. Tashkent is strong in machine-building, food and construction — for Rubber Bushings we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMNatural rubberPolyurethaneSilicone
Applications
  • Equipment vibration isolation
  • Automotive suspension
  • Conveyor systems
  • Electric motors
  • Construction machinery
Advantages
  • ✓Rubber-metal constructions
  • ✓Precision injection molding
  • ✓Vibration damping
  • ✓Any size by drawing
  • ✓Import substitute

Tashkent machine-building plants and conveyor lines are the main consumers of rubber-metal bushings. Vulcanized bonding to metal sleeve ensures reliable adhesion at impact loads up to 50 kN.

Tashkent is Uzbekistan's capital and largest industrial hub. Machine-building plants, textile mills, food factories and construction companies here constantly need quality seals, gaskets and technical rubber parts. Our factory is located directly in Tashkent, enabling on-site measurement, sample pickup and same-day delivery.

Delivery & production

Tashkent · Delivery in Tashkent in 1 day

Manufactured in Tashkent. Delivery in Tashkent in 1 day. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Vibration, impact−40…+80 °Cno pressureNR, SBR, EPDM
Oil-containing mediaup to +100 °Cup to 5 barNBR, rubber-metal
Mining, abrasiveup to +70 °Cup to 20 barPolyurethane, rubber-metal

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Tashkent by transport company. Delivery in Tashkent in 1 day. Double packaging and cargo tracking. Pickup from our Tashkent plant by appointment.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Tashkent. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Tashkent, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery in Tashkent in 1 day. After production we hand over to a carrier or arrange courier delivery. Pickup from our Tashkent plant by appointment.