How to Order Custom Rubber Products: Step-by-Step Guide

How to Order Custom Rubber Products: Step-by-Step Guide

Article

Ordering RTI from a drawing means agreeing geometry and compound, then manufacturing. The sequence below is the working process — not a promise that every order is equally fast.

Step 1: Prepare a drawing or sample. A CAD file, PDF, photo with dimensions or even a worn sample will work.

Step 2: Submit your request via WhatsApp or call +998 90 944 99 40. Attach the drawing and describe working conditions.

Step 3: Receive a quote within 2-4 hours with optimal material recommendation and production timeline.

Step 4: After approval, a standard batch with existing tooling is typically 3–5 business days. A new mold is a separate stage, about 10–14 days. A rush slot is discussed in the quote when the shop is free — not a site-wide rule.

Step 5: Quality control — dimensional check and visual inspection. Testing available on request.

Step 6: Delivery across Uzbekistan by transport company. Same-day courier in Tashkent.

If the part does not match the agreed drawing and compound, we remake it at our cost. That does not cover an informal “like the old part” if sizes were never frozen.

We accept PDF, DWG and dimensioned sketches. If tolerances are missing, we freeze a process tolerance in writing before launch.

A 48-hour start applies only with existing tooling and an approved compound. A new mold is usually 10–14 days. A standard batch after approval is 3–5 business days.

Besides geometry, the request needs medium, temperature and pressure.

Rework at our cost applies to the agreed drawing and compound, not to an informal “like the old part”.