Molds for Rubber Products: Our Manufacturing Process

Molds for Rubber Products: Our Manufacturing Process

Article

The mold is a key element in producing molded rubber products. At REZINA.UZ we manufacture molds on our own equipment.

Stage 1: Design. Based on drawing or sample, the engineer creates a 3D model accounting for rubber shrinkage (1.5-3%).

Stage 2: Steel selection. Tool steel with hardening for serial production. Aluminum molds for small batches — cheaper and faster.

Stage 3: CNC milling. Machining accuracy up to 0.02 mm. Complex shapes with undercuts, multi-cavity molds.

Stage 4: Testing. First samples are molded and dimensionally checked. Mold adjusted if needed.

Timeline: a typical new mold is about 10–14 business days. Complex multi-cavity tools can take longer. After geometry sign-off, batches follow a 3–5 day schedule. The mold stays with us for repeat orders.

Cost depends on complexity and number of cavities. Usually 500,000 to 5,000,000 UZS. Installment plans for regular clients.

A mold is a one-off: its cost is spread over the run. Tens of rings are often cheaper cut from sheet. Hundreds of identical profiles pay for tooling.

0.1 mm on a lip comes from the tool, shrink and cure — not press force. A trial shot is agreed before series.

New tooling is typically about 10–14 days. After geometry sign-off, batches follow a 3–5 day schedule.

Customer-owned molds are accepted after inspection: a cracked cavity scrapes parts before the compound is poured.