REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Custom Molded Products
from 100 pcsFrom 48 hoursDelivery to Fergana in 1-2 daysQuality guarantee

Custom Molded Products in Fergana — NBR, EPDM, Viton / FKM, made in Tashkent

For Fergana region production facilities in Fergana — custom molded products with grade selection for your medium. NBR, EPDM, Viton / FKM, dimensional and hardness control. Delivery to Fergana in 1-2 days. Fergana is strong in petrochemicals and chemicals — for Custom Molded Products we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMSiliconePolyurethaneNatural rubber
Applications
  • Non-standard equipment seals
  • Shock absorbers and buffers
  • Protective caps and plugs
  • Membranes and valves
  • Import substitution parts
Advantages
  • Turnkey mold design
  • Hot pressing accuracy 0.1 mm
  • Series from 100 pcs
  • Any Shore A hardness 30-90
  • Import parts replacement

Production in Tashkent. Delivery to Fergana in 1-2 days. Shipped by transport company, packaging included.

Fergana petrochemical reactor and pump units need Viton and FKM membranes, valve discs and diaphragms — series from 100 pcs with chemical certification.

Fergana region is Uzbekistan's chemical industry center. The Fergana refinery and Fergana-Azot have strict requirements for seal chemical resistance. We select materials (Viton, FKM, PTFE) for aggressive media at temperatures up to +250°C, ensuring long part service life.

Material selection by conditions

Guide by medium, temperature and pressure — exact quote after drawing

MediumTemperaturePressureMaterial
Protective caps−40…+80 °Cno pressureSBR, EPDM
Membranes, valvesup to +150 °Cup to 16 barNBR, silicone
Automotive, fasteners−30…+120 °Cup to 5 barNBR, EPDM
Chemical-resistant moldsup to +200 °Cup to 25 barViton, FKM

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Fergana by transport company. Delivery to Fergana in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Fergana. See the selection table below.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Fergana, ask when ordering — we often accelerate using existing molds.

HomeCatalog
BlogOrderContacts