REZINA.UZ
ELASTIK FORM
From idea to finished part.
Custom Molded Products
from 100 pcsStandard: 3–5 daysDelivery to Kattakurgan in 1–2 daysQuality guarantee

Custom Molded Rubber Parts in Kattakurgan

We take orders for molded rubber parts for plants in Kattakurgan. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Viton / FKM. Delivery to Kattakurgan in 1–2 days.

Materials
NBREPDMViton / FKMSiliconePolyurethaneNatural rubber
Applications
  • Non-standard equipment seals
  • Shock absorbers and buffers
  • Protective caps and plugs
  • Membranes and valves
  • Import substitution parts
Advantages
  • ✓Turnkey mold design
  • ✓Hot pressing accuracy 0.1 mm
  • ✓Series from 100 pcs
  • ✓Any Shore A hardness 30-90
  • ✓Import parts replacement

For the Kattakurgan pump stations, EPDM is recommended for water, NBR for bearing oil and valve hydraulics. With silt and sand, a harder cuff lip is the better choice.

Delivery & production

Kattakurgan · Delivery to Kattakurgan in 1–2 days

Manufactured in Tashkent. Delivery to Kattakurgan in 1–2 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Protective caps−40…+80 °Cno pressureSBR, EPDM
Membranes, valvesup to +150 °Cup to 16 barNBR, silicone
Automotive, fasteners−30…+120 °Cup to 5 barNBR, EPDM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Kattakurgan by transport company. Delivery to Kattakurgan in 1–2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Kattakurgan. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Kattakurgan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Kattakurgan in 1–2 days. After production we hand over to a carrier or arrange courier delivery.