REZINA.UZ
ELASTIK FORM LLC
From idea to finished part.
Custom Molded Products
from 100 pcsFrom 48 hoursDelivery to Namangan in 1-2 daysQuality guarantee

Custom Molded Products factory for Namangan — Full cycle & delivery

Urgent custom molded products order to Namangan: production from 48 hours after drawing approval. Materials: NBR, EPDM, Viton / FKM, made in Tashkent. Delivery to Namangan in 1-2 days. We work with Namangan region enterprises. Namangan is strong in textile, leather and food — for Custom Molded Products we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMSiliconePolyurethaneNatural rubber
Applications
  • Non-standard equipment seals
  • Shock absorbers and buffers
  • Protective caps and plugs
  • Membranes and valves
  • Import substitution parts
Advantages
  • Turnkey mold design
  • Hot pressing accuracy 0.1 mm
  • Series from 100 pcs
  • Any Shore A hardness 30-90
  • Import parts replacement

Namangan textile machines and food lines require specialized molded parts — non-standard gaskets, buffer dampers, complex profile sealing rings. By customer drawing.

Namangan region specializes in light industry and agricultural processing. Silk mills need vibration-isolating bushings for looms, canning factories require food-grade silicone seals, and leather plants order chemical-resistant gaskets from EPDM and Viton. We select the optimal material for each application.

Delivery & production

Namangan · Delivery to Namangan in 1-2 days

Manufactured in Tashkent. Delivery to Namangan in 1-2 days. Packed in corrugated cardboard and stretch film.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Protective caps−40…+80 °Cno pressureSBR, EPDM
Membranes, valvesup to +150 °Cup to 16 barNBR, silicone
Automotive, fasteners−30…+120 °Cup to 5 barNBR, EPDM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Namangan by transport company. Delivery to Namangan in 1-2 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via Telegram — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Namangan. Short guide table below; full grades on the product page.

From 100 pcs (or one batch for custom shapes). Lead time from 48 hours after drawing and material approval. For urgent orders to Namangan, ask when ordering — we often accelerate using existing molds.

Yes. Send drawing, photos or the worn part via Telegram @Uzne0 — we quote lead time, material and price. For plants in Namangan, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Namangan in 1-2 days. After production we hand over to a carrier or arrange courier delivery.

HomeCatalog
BlogOrderContacts