REZINA.UZ
ELASTIK FORM
From idea to finished part.
Custom Molded Products
from 100 pcsStandard: 3–5 daysDelivery to Almazar in 1 dayQuality guarantee

Custom Molded Rubber Parts in Almazar District, Tashkent

We manufacture molded rubber parts by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery to Almazar in 1 day. We work with textile mills and production bases. Almazar District is active in textile mills; for Molded Rubber Parts we match materials to Almazar textile mills and production bases operating conditions.

Materials
NBREPDMViton / FKMSiliconePolyurethaneNatural rubber
Applications
  • Non-standard equipment seals
  • Shock absorbers and buffers
  • Protective caps and plugs
  • Membranes and valves
  • Import substitution parts
Advantages
  • ✓Turnkey mold design
  • ✓Hot pressing accuracy 0.1 mm
  • ✓Series from 100 pcs
  • ✓Any Shore A hardness 30-90
  • ✓Import parts replacement

Almazar textile mills order molded buffers for loom frames, roller protective covers and steam chamber hatch seals from EPDM and heat-resistant silicone.

Almazar District is Tashkent's heavy industry and construction center. Construction companies order hydraulic seals for special equipment, transport bases order oil seals and cuffs for trucks, factories order rings and gaskets for process equipment.

Delivery & production

Almazar District · Delivery to Almazar in 1 day

Manufactured in Tashkent. Delivery to Almazar in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Protective caps−40…+80 °Cno pressureSBR, EPDM
Membranes, valvesup to +150 °Cup to 16 barNBR, silicone
Automotive, fasteners−30…+120 °Cup to 5 barNBR, EPDM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Almazar District by courier or carrier. Delivery to Almazar in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Almazar District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Almazar District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Almazar in 1 day. After production we hand over to a carrier or arrange courier delivery.