REZINA.UZ
ELASTIK FORM
From idea to finished part.
Custom Molded Products
from 100 pcsStandard: 3–5 daysDelivery to Yashnabad in 1 dayQuality guarantee

Custom Molded Rubber Parts in Yashnabad District, Tashkent

We manufacture molded rubber parts by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery to Yashnabad in 1 day. We work with food enterprises and repair workshops. Yashnabad District is active in food and repair; for Molded Rubber Parts we match materials to Yashnabad food enterprises and repair shops operating conditions.

Materials
NBREPDMViton / FKMSiliconePolyurethaneNatural rubber
Applications
  • Non-standard equipment seals
  • Shock absorbers and buffers
  • Protective caps and plugs
  • Membranes and valves
  • Import substitution parts
Advantages
  • ✓Turnkey mold design
  • ✓Hot pressing accuracy 0.1 mm
  • ✓Series from 100 pcs
  • ✓Any Shore A hardness 30-90
  • ✓Import parts replacement

Yashnabad food and repair enterprises order silicone (food media) and NBR (industrial pumps) molded parts. From 48 hours, series from 50 pcs.

Yashnabad is one of Tashkent's oldest industrial districts. Large textile mills order vibration-isolating bushings, food plants order silicone seals, construction bases order hydraulic cuffs and gaskets for construction equipment. We supply in batches under contract.

Delivery & production

Yashnabad District · Delivery to Yashnabad in 1 day

Manufactured in Tashkent. Delivery to Yashnabad in 1 day. Packaging and handover time are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Protective caps−40…+80 °Cno pressureSBR, EPDM
Membranes, valvesup to +150 °Cup to 16 barNBR, silicone
Automotive, fasteners−30…+120 °Cup to 5 barNBR, EPDM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

After production, we send the order to Yashnabad District by courier or carrier. Delivery to Yashnabad in 1 day. Handover time is confirmed with the order; packaging and documents are included.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yashnabad District. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yashnabad District, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yashnabad in 1 day. After production we hand over to a carrier or arrange courier delivery.