REZINA.UZ
ELASTIK FORM
From idea to finished part.
Custom Molded Products
from 100 pcsStandard: 3–5 daysDelivery to Urgench in 2-3 daysQuality guarantee

Custom Molded Rubber Parts in Urgench

We manufacture molded rubber parts by drawing, sample or customer dimensions at our Tashkent production site. Main materials: NBR, EPDM, Viton / FKM. Delivery to Urgench in 2-3 days. We work with Khorezm region enterprises. Urgench is strong in agribusiness and cotton processing — for Molded Rubber Parts we match rubber grades to actual operating conditions at regional sites.

Materials
NBREPDMViton / FKMSiliconePolyurethaneNatural rubber
Applications
  • Non-standard equipment seals
  • Shock absorbers and buffers
  • Protective caps and plugs
  • Membranes and valves
  • Import substitution parts
Advantages
  • Turnkey mold design
  • Hot pressing accuracy 0.1 mm
  • Series from 100 pcs
  • Any Shore A hardness 30-90
  • Import parts replacement

Khorezm agricultural and cotton processing machines need molded buffer dampers, cuffs and non-standard gaskets in NBR and EPDM — by sample.

Khorezm region is an agricultural area with extensive irrigation infrastructure. Dozens of pump stations maintain cotton field irrigation — all need regular replacement of oil seals, cuffs and sealing rings. Cotton gins and flour mills order food-grade silicone gaskets and EPDM seals.

Delivery & production

Urgench · Delivery to Urgench in 2-3 days

Manufactured in Tashkent. Delivery to Urgench in 2-3 days. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Protective caps−40…+80 °Cno pressureSBR, EPDM
Membranes, valvesup to +150 °Cup to 16 barNBR, silicone
Automotive, fasteners−30…+120 °Cup to 5 barNBR, EPDM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Urgench by transport company. Delivery to Urgench in 2-3 days. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Urgench. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Urgench, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Urgench in 2-3 days. After production we hand over to a carrier or arrange courier delivery.