REZINA.UZ
ELASTIK FORM
From idea to finished part.
Custom Molded Products
from 100 pcsStandard: 3–5 daysDelivery to Yangiyul in 1 dayQuality guarantee

Custom Molded Rubber Parts in Yangiyul

We take orders for molded rubber parts for plants in Yangiyul. Made to drawing, sample or dimensions at our Tashkent plant. Main materials: NBR, EPDM, Viton / FKM. Delivery to Yangiyul in 1 day.

Materials
NBREPDMViton / FKMSiliconePolyurethaneNatural rubber
Applications
  • Non-standard equipment seals
  • Shock absorbers and buffers
  • Protective caps and plugs
  • Membranes and valves
  • Import substitution parts
Advantages
  • ✓Turnkey mold design
  • ✓Hot pressing accuracy 0.1 mm
  • ✓Series from 100 pcs
  • ✓Any Shore A hardness 30-90
  • ✓Import parts replacement

For food lines in Yangiyul, silicone is recommended where the part touches the product, EPDM for steam and washdown. NBR for cotton-press oil up to +120 °C, FKM if the press runs hotter.

Delivery & production

Yangiyul · Delivery to Yangiyul in 1 day

Manufactured in Tashkent. Delivery to Yangiyul in 1 day. Packaging and shipping method are agreed before dispatch.

Made at our own plant in Tashkent. Packaging and batch documents included.

Material selection by conditions

Short guide — full table on the product page

MediumTemperaturePressureMaterial
Protective caps−40…+80 °Cno pressureSBR, EPDM
Membranes, valvesup to +150 °Cup to 16 barNBR, silicone
Automotive, fasteners−30…+120 °Cup to 5 barNBR, EPDM

Full material selection table →

FAQ

Delivery, materials and lead times for your order

Pick a topic or open any question

We manufacture in Tashkent and ship to Yangiyul by transport company. Delivery to Yangiyul in 1 day. Double packaging and cargo tracking.

Depends on medium (oil, water, steam, chemicals), temperature and pressure. Send drawing or sample via WhatsApp — our engineer will select NBR, EPDM, Viton, silicone or polyurethane for your site in Yangiyul. Short guide table below; full grades on the product page.

Minimum quantity depends on the product and material. Standard lead time is 3–5 business days; a new mold usually requires 10–14 days. We confirm the exact schedule after reviewing the drawing or sample.

Yes. Send drawing, photos or the worn part via WhatsApp — we quote lead time, material and price. For plants in Yangiyul, photos with a scale and operating medium description are usually enough.

If the part does not match the approved drawing in dimensions and material, we rework at our cost. Before a production run we agree tolerances and inspection method.

Manufacturing and warehouse are in Tashkent. Delivery to Yangiyul in 1 day. After production we hand over to a carrier or arrange courier delivery.