REZINA.UZ
ELASTIK FORM
From idea to finished part.
Rubber Products for Energy Industry
Custom orderstandard: 3–5 daysCertified materials

Rubber parts for power generation in Bukhara

EPDM is recommended for the steam line and water at the refinery, FKM for hydrocarbons. Made in Tashkent. Delivery to Bukhara in 1-2 days.

Materials
EPDM — steam and hot water resistantViton / FKM — up to +250°C, chemical resistantSilicone — electrical insulation and heat resistantNBR — for oil cooling systemsPTFE — for aggressive media
Products for industry
  • Steam and gas turbine seals
  • Plate heat exchanger gaskets
  • Vibration mounts for generators
  • Cable entries and seals
  • Pipeline flange gaskets
  • Pump equipment dampers
Advantages
  • ✓Operating temperatures up to +250°C
  • ✓Steam, oil and chemical resistant
  • ✓Electrical insulation properties
  • ✓Replacement of Siemens, ABB seals
  • ✓Urgent production — minimize plant downtime
TashkentPlant
yesDrawing or sample
3–5 daysLead time
Delivery to Bukhara in 1-2 daysDispatch

What we make

  • Heat-exchanger and flange gaskets
  • Valve rings
  • Pump shaft seals
  • Sheets cut to size

Material recommendation

  • EPDM — water and steam up to +150 °C
  • FKM — if the joint has oil and the temperature is above the EPDM limit
  • NBR — oil pumps. For the steam line — EPDM

What to include in a request

  • A drawing, dimensioned sketch or worn sample of the part.
  • The working medium, temperature, pressure and duty cycle.
  • Seat dimensions if the seal works in a groove, on a shaft or rod.
  • Quantity and the date the batch is required.

Selection and limits

  • The grade follows medium, temperature and load; colour or a name on old rubber does not prove its compound.
  • Dimensions and tolerances are agreed before launch; worn samples are checked against the seat as well.
  • Rubber bladders, pneumatic chambers, bladder compensators and large molded parts are not manufactured.

Need a batch for your medium?

Send the medium, temperature and size. We will name the grade and the lead time.